DOT Road Widening

Ohio | 2023

The Hydaker-Wheatlake Co. relocated two miles of 69kV transmission line in Monroe, OH for the ODOT road widening project. This included the replacement of two 345kV lattice tower with three drilled pier foundations and three 180ft engineered steel poles.